Bathroom Renovations in Oakleigh

Bathroom Renovation in Oakleigh VIC 3166
Melbourne's South-East · VIC 3166

Casey Quality Coatings delivers complete bathroom renovations in Oakleigh VIC 3166. From demolition to handover — waterproofing, tiling, fixture installation and painting — we manage the entire project so you don't have to juggle multiple trades.

⭐5.0 Google Rating
✔AS 3740 Compliant
✔Fixed-Price Quotes
✔Fully Insured
Call now for a same-day quote:0490 049 136
5.0★
Google Rating
AS 3740
Certified
10+
Years Experience
Same Day
Quote Response

BATHROOM RENOVATION IN OAKLEIGH

Looking for a complete bathroom renovation in Oakleigh? We manage the entire project from demolition to handover — waterproofing, tiling, fixture installation and painting. No juggling multiple trades, no communication gaps. Just one reliable team delivering a beautiful, fully waterproofed bathroom in your Oakleigh VIC 3166 home. Every renovation includes AS 3740-compliant waterproofing and a Certificate of Waterproofing on completion.

WHAT'S INCLUDED

  • Full bathroom & ensuite renovations in Oakleigh
  • Demolition, waterproofing, tiling & painting
  • Fixture supply & installation
  • Fixed-price quotes — no surprises
  • One trade, one point of contact
  • AS 3740 waterproofing on every renovation
"What a great job Abdul carried out on my balcony. Polite, competent and timely, together with providing a Certificate of Waterproofing that many other tradies would not touch. Highly recommended, could not be happier."

Robert Carpino

Google Review ★★★★★
AS 3740 Compliant
Certified Trade
5★ Rated

BATHROOM RENOVATION IN OAKLEIGH — REAL JOB PHOTOS

Four angles from the same bathroom renovation in Oakleigh — large-format cream marble-look tiles, built-in bath, timber vanity, recessed niche, diagonal floor tile pattern. Shot at the tiling stage before the shower screen and tapware were fitted. This is the full picture of the job.

The tile is a large-format cream marble-look porcelain — 600×600 on the floor, larger format on the walls, laid floor to ceiling on all four walls. The floor tiles are set on a diagonal with the grout lines meeting at the centre-drain — that's not just a design choice, it's the correct way to tile to a centre floor waste, because the diagonal layout means every tile cut at the perimeter is consistent and the fall to the drain reads cleanly. The shower recess has a recessed niche tiled in matching tile, a square floor drain, and tap rough-ins ready for the shower screen. The built-in bath sits in the back corner with the same wall tile running behind it. The timber-look vanity sits beside it. The exhaust fan and downlight are in the ceiling. The original timber floorboards are visible through the doorway — this is a full bathroom gut and retile, not a patch job. Waterproofed to AS 3740 before a single tile went on.

Shower recess with large-format cream marble-look tiles, recessed niche and square floor drain — Oakleigh bathroom renovation by Casey Quality CoatingsShower recess

Floor to ceiling marble-look tile, recessed niche, square drain, tap rough-in ready for screen

Overhead view of full bathroom floor with diagonal large-format tile pattern meeting at centre drain — Oakleigh by Casey Quality CoatingsOverhead — floor

Diagonal tile layout to centre drain — consistent perimeter cuts, built-in bath and timber vanity in corner

Wide shot of bathroom from shower end — all four walls tiled floor to ceiling, exhaust fan and downlight in ceiling, doorway to timber floor hallway — Oakleigh by Casey Quality CoatingsFrom shower end

All four walls tiled floor to ceiling — exhaust fan, downlight, doorway to original timber floor hallway

Wide shot of full bathroom from doorway — window on back wall, built-in bath, timber vanity, large-format floor tiles — Oakleigh by Casey Quality CoatingsFrom doorway

Full room view — window, bath, vanity, all walls tiled, tap rough-ins on right wall ready for shower screen

Large-format cream marble-look porcelain — walls tiled floor to ceiling on all four walls

Diagonal floor tile layout to centre drain — correct method for a centre-waste floor, consistent perimeter cuts

Recessed niche tiled in matching tile — waterproofed behind the niche before tiling

Square floor drain in shower recess centred and set to correct fall

Built-in bath in back corner — wall tile runs behind and around the bath surround

Timber-look vanity with white stone top — set after tiling, not before

Exhaust fan and recessed downlight in new ceiling — full bathroom gut, not a retile over existing

AS 3740 waterproofing completed before tiling — Certificate of Waterproofing issued on completion

Bathroom renovation in Oakleigh? We handle the full job — waterproofing, tiling, bath, vanity and fittings. One trade, one quote, one job done properly. Fixed-price before we start.

Get a Quote

WHY OAKLEIGH HOMEOWNERS CHOOSE US

  • Certified & fully insured tradespeople
  • AS 3740-compliant waterproofing — Certificate of Waterproofing on every job
  • Free, fixed-price no-obligation quotes
  • Quality materials and guaranteed workmanship
  • Prompt, reliable and professional service
  • Local knowledge of Melbourne's south-east

BATHROOM RENOVATION OAKLEIGH — FAQs

Can you manage a complete bathroom renovation in Oakleigh?

Yes. We coordinate the renovation stages for Oakleigh homes, including demolition, waterproofing, tiling and finishing work, with one clear scope of work.

What should I decide before an Oakleigh bathroom renovation quote?

Bring your room measurements, preferred layout, fixture ideas and finish preferences. We use these details to prepare a practical Oakleigh renovation scope.

Can you renovate a compact ensuite in Oakleigh?

Yes. We work in compact ensuites and bathrooms of all sizes in Oakleigh, adjusting the scope to suit the available space and your chosen layout.

Is waterproofing included in an Oakleigh bathroom renovation?

Yes. AS 3740 compliant waterproofing is completed before tiling in every Oakleigh bathroom renovation we undertake, and a Certificate of Waterproofing is issued.

How long will my Oakleigh bathroom renovation take?

Duration depends on the scope — a standard bathroom renovation in Oakleigh typically takes one to two weeks once materials are on site and the work has started.

Can I stay in my Oakleigh home during the renovation?

Most Oakleigh homeowners stay in the property during a bathroom renovation. We work to a clear daily schedule and keep the rest of the home accessible.

STILL HAVE QUESTIONS? CALL US — NO OBLIGATION.

We answer calls 7 days. Free fixed-price quote for Oakleigh & surrounds.

GET A FREE BATHROOM RENOVATION QUOTE IN OAKLEIGH TODAY

Free, fixed-price bathroom renovation quote in Oakleigh VIC 3166. No hidden charges. Same-day response.

0490 049 136