Certified bathroom waterproofing Melbourne homeowners can rely on — showers, ensuites, balconies and all wet areas. Two-coat membrane systems, AS 3740:2021 compliant, with a Certificate of Waterproofing and 7-year workmanship warranty on every job.
Bathroom waterproofing is the most critical step in any wet area construction or renovation. Done wrong, it leads to leaking showers, damp walls, mould, structural timber damage and costly remediation. Casey Quality Coatings applies two-coat liquid membrane systems that comply with Australian Standard AS 3740:2021, protecting your property for the long term.
AS 3740:2021 (Waterproofing of Domestic Wet Areas) is the Australian Standard that specifies minimum membrane thickness, turn-up heights, substrate preparation requirements, cure times and flood-test procedures for all domestic wet areas. Compliance is mandatory under the National Construction Code (NCC) for new builds and renovations. We issue a Certificate of Waterproofing on every job — documenting the system used, areas covered and compliance achieved.
Our six-step membrane application process follows AS 3740:2021 exactly — from substrate preparation through to flood test and certificate. No shortcuts, no skipped cure times.
We inspect the substrate for cracks, voids, contamination and moisture. All surfaces are cleaned, primed and any cracks are filled with flexible filler before membrane application. A sound, clean substrate is the foundation of a lasting waterproofing system.
All pipe penetrations, floor-wall junctions, internal corners and hob junctions are reinforced with bond-breaker tape and sealed with membrane. These are the highest-risk points for water ingress — AS 3740 specifies minimum 50mm reinforcement at all junctions.
The first coat of liquid-applied membrane is applied to the full wet area, including the floor and walls to the required turn-up height (minimum 150mm above finished floor level for showers, 100mm for other wet areas per AS 3740). This coat seals the substrate and penetrations.
The first coat is allowed to cure fully before the second coat is applied. Cure time varies by product and conditions — typically 4–8 hours. Rushing this step is one of the leading causes of early membrane failure. We never tile over an uncured membrane.
The second coat builds the membrane to the required dry film thickness (DFT) — minimum 0.5mm for internal wet areas, higher for external and balcony applications. The full membrane system is now continuous, flexible and bonded to the substrate.
Once fully cured, the wet area is flood-tested for a minimum of 24 hours to confirm the membrane is watertight. On passing, we issue the Certificate of Waterproofing documenting the system used, areas covered, turn-up heights and AS 3740 compliance.
On completion of every waterproofing job, we issue a Certificate of Waterproofing documenting the membrane system used, areas covered, turn-up heights achieved and compliance with AS 3740:2021. This certificate is required by building surveyors, insurance companies and conveyancers — and adds real value when you sell your property.
Balcony waterproofing failures are among the most expensive defects in Victorian homes and apartment buildings. Unlike internal bathrooms, external balconies are exposed to UV radiation, thermal movement, ponding water and wind-driven rain — conditions that demand a higher-specification membrane system than internal wet areas.
Casey Quality Coatings installs balcony waterproofing systems across Victoria that comply with AS 3740 and the National Construction Code (NCC). We ensure correct falls to drains (minimum 1:100), full penetration sealing around posts, balustrades and pipes, and membrane systems rated for external exposure. Every balcony job includes a Certificate of Waterproofing.
Common balcony waterproofing failures
Incorrect falls, unsealed penetrations and inadequate membrane thickness are the three most common causes of balcony waterproofing failure in Melbourne homes. All three are preventable with correct AS 3740 installation.
Every waterproofing job we complete is backed by a workmanship warranty, a compliance certificate and quality materials with manufacturer warranties.
We back every waterproofing job with a 7-year workmanship warranty. If the membrane fails due to our installation — incorrect application, missed penetrations, inadequate turn-up heights — we fix it at no cost. The warranty is documented and transferable.
A Certificate of Waterproofing is issued on every job, documenting the membrane system, areas covered, turn-up heights and compliance with AS 3740:2021. Required for building inspections, insurance, strata records and property resale.
The membrane systems we use carry manufacturer product warranties of 10–15 years. Combined with our 7-year workmanship warranty, your wet area is protected from both installation defects and material failure.
Every job complies with Australian Standard AS 3740:2021. Correct membrane thickness, turn-up heights and substrate preparation — no shortcuts.
You receive a Certificate of Waterproofing on completion — AS 3740 compliant documentation required for inspections, insurance and resale.
We back our work with a 7-year workmanship warranty. If the membrane fails due to our installation, we fix it — no questions asked.
We provide AS 3740-compliant waterproofing throughout Melbourne's south-east — from the Casey region to the Monash area and inner south.
Questions about AS 3740, membrane systems, warranties and leaking shower repairs.
All our waterproofing work complies with Australian Standard AS 3740:2021 (Waterproofing of Domestic Wet Areas). This standard specifies minimum membrane thickness, turn-up heights, substrate preparation requirements and cure times. We issue a Certificate of Waterproofing on every job — AS 3740 compliant documentation provided on completion.
In most cases, yes. Surface sealants and grout injections are temporary fixes that mask the problem. The only permanent solution is a full strip-out, re-waterproofing with a two-coat membrane system applied to the correct turn-up heights, and re-tiling. We assess every job and give you an honest recommendation — if a strip-out is needed, we'll tell you why.
Yes. We waterproof balconies, terraces and alfresco areas across Victoria using systems designed for external exposure — including correct falls to drains (minimum 1:100 fall per AS 3740), penetration sealing around posts and pipes, and membrane systems rated for outdoor UV and thermal movement. Balcony waterproofing failures are one of the most common and costly defects in Melbourne homes.
A standard bathroom waterproofing job (strip-out, substrate preparation, two-coat membrane, full cure) typically takes 2–3 days before tiling can commence. Cure time is critical — applying tiles over an uncured membrane is one of the leading causes of early waterproofing failure. We never rush the cure. We'll give you a clear timeline with your fixed-price quote.
Yes — on every job, without exception. The certificate documents the membrane system used, the areas covered, turn-up heights achieved and compliance with AS 3740:2021. It's essential for building inspections, insurance claims, strata records and property resale. Some lenders and conveyancers now request this certificate as part of settlement.
We use two-coat liquid-applied membrane systems from leading Australian suppliers. The first coat seals the substrate and penetrations; the second coat builds the membrane to the required thickness (minimum 0.5mm DFT for internal wet areas, higher for external/balcony applications). We select the membrane system based on substrate type, exposure conditions and the specific area being waterproofed.
We provide a 7-year workmanship warranty on all waterproofing work. This covers membrane application defects, incorrect turn-up heights and installation failures. The warranty is backed by the Certificate of Waterproofing issued on completion. Manufacturer product warranties (typically 10–15 years) apply separately to the membrane materials used.
Re-waterproofing is the process of stripping out an existing failed or aged wet area and applying a new membrane system. It's needed when a shower or wet area is leaking, when the original membrane has failed due to age or incorrect installation, or when a bathroom is being renovated. Re-waterproofing to AS 3740 is required any time tiles are removed from a wet area — even if the original membrane appears intact.
Call us for a free, fixed-price quote. AS 3740-compliant waterproofing. Certificate of Waterproofing on every job. 7-year workmanship warranty.